paybutton rw

album 2 2011 04 07 012
album 3 2011 04 04 042
album 2 2011 03 18 034
album 3 2011 04 04 037
album 2 2011 03 18 069

Our 6.2 million dollar "District-Wide Improvement Project" was completed in the Fall 2011. The three separate contracts include an additional new 1.5 million gallon clear well at the water plant that will deliver water through a new trunk line to the distribution system, 6.2 miles of new waterline designed to balance the delivery of water throughout the District, a new 1.1 million gallon water tower that will greatly enhance storage capacity, and the complete refurbishing of one of the other water towers. The end result will allow the water plant to operate at capacity when necessary, delivering up to 8 million gallons of potable water per day throughout the District. That capacity will meet the demand from anticipated growth within the District for years to come. Additionally, water pressure should remain constant throughout the distribution system.